您当前的位置:
首页 >
文章列表页 >
Key points analysis and control for start-up process of a 1 000 MW double-reheat unit
Thermal Power Generation   Vol. 46, Issue 8, Pages: 113-118+126(2017)
更新时间:2025-05-30
    • Key points analysis and control for start-up process of a 1 000 MW double-reheat unit

    • CLC: TM621
    • Published:2017

    移动端阅览

  • LIAO Junlin, SONG Xiaohui, WANG Tao, et al. Key points analysis and control for start-up process of a 1 000 MW double-reheat unit[J]. Thermal Power Generation2017, 46(8): 113-118+126. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

192

下载量

5

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

AN APPROACH TO SEVERAL PROBLEMS ABOUT THE DRIVING TURBINE OF FEED-WATER PUMPS
Development and application of high precision multi-function simulation system for ultra supercritical double-reheat units
RETROFIT OF LUBRICATING OIL SYSTEM FOR 330MW STEAM TURBINE
RUNNING FEATURES OF SMALL TURBINE FOR FEED-WATER PUMP OF ULTRA-SUPERCRITICAL 660 MW UNIT AND FAULT ANALYSIS THEREOF
Simulation study on coordinated control system of subcritical 600 MW unit

Related Author

HAN Zijun
CAI Baoling
GAO Haidong
CAO Jun
ZHOU Dongyang
ZHENG Xiaogang
GU Zhengmeng
WU Hengyun

Related Institution

Northwest Electric Power Design Institute Xi'an
Pucheng Power Generation Co., Ltd., Pucheng
Huaneng Shanghai Shidongkou Second Power Plant
School of Mechanical and Power Engineering, Shanghai Jiao Tong University
School of Environmental Science and Engineering, Chang'an University
0