Key points analysis and control for start-up process of a 1 000 MW double-reheat unit
Thermal Power GenerationVol. 46, Issue 8, Pages: 113-118+126(2017)
更新时间:2025-05-30
分享给微信好友或者朋友圈
导出参考文献
Key points analysis and control for start-up process of a 1 000 MW double-reheat unit
作者机构:
1. 西安热工研究院有限公司
2. 中国华能集团清洁能源技术研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2017
稿件说明:
移动端阅览
LIAO Junlin, SONG Xiaohui, WANG Tao, et al. Key points analysis and control for start-up process of a 1 000 MW double-reheat unit[J]. Thermal Power Generation2017, 46(8): 113-118+126.
DOI:
LIAO Junlin, SONG Xiaohui, WANG Tao, et al. Key points analysis and control for start-up process of a 1 000 MW double-reheat unit[J]. Thermal Power Generation2017, 46(8): 113-118+126.DOI:
Key points analysis and control for start-up process of a 1 000 MW double-reheat unit
Compared with the conventional single-reheat units
the double-reheat units has disadvantages of high starting parameters and complicate systems
which propose higher demands for the start-up process. Thus
by taking the 1 000 MW double-reheat unit in Huaneng Laiwu Power Plant as the research object
the key steps of the startup process and the pre-start check contents were investigated to put forward the corresponding control strategies. The result shows that
the cylinder exhausting temperature
the gland seal system and the lubricating oil system are the key factors affecting the start-up process. Uniformly controlling the temperature rise of each component during the start-up process to meet the X criterion and stress limit is one of the key points. Reasonable flushing of the lubricating oil system and correct adjustment of throttle valves directly affect the success of start-up process. The discussions for the key points of the gland seal control system ensure the safety and stability of the gland seal system. The above scheme can provide reference for start-up process of the same type double-reheat units.