您当前的位置:
首页 >
文章列表页 >
Optimization on flue gas waste heat recovery scheme in utility boiler
Thermal Power Generation   Vol. 46, Issue 7, Pages: 5-11(2017)
更新时间:2025-09-28
    • Optimization on flue gas waste heat recovery scheme in utility boiler

    • CLC: TK115;TM621.2
    • Published:2017

    移动端阅览

  • ZHENG Puyan, WANG Qiaoliang, ZHU Qunzhi, et al. Optimization on flue gas waste heat recovery scheme in utility boiler[J]. Thermal Power Generation, 2017, 46(7): 5-11. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

311

下载量

13

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

A deep waste heat utilization system for utility boilers based on segmented air preheater design
ENERGY-SAVING EARNING ESTIMATION FOR WASTE HEAT RECOVERY OF CIRCULATING WATER BY ABSORPTION TYPE HEAT PUMP TECHNOLOGY
Investigation of coal blending optimization for power plants based on quantum-behaved particle swarm optimization
Linear auto disturbance rejection control system for water level in drum
Design optimization for distributed combined heat and power cogeneration systems:research progress

Related Author

LI Yongyi
HAN Yu
CHEN Yuan
XU Gang
YANG Yongping
WANG Yanhai2 1.Hebei Electric Power Research Institute
LI Qiong1
XI Mengjie1

Related Institution

Beijing Key Laboratory of Pollutant Control in Thermal Power Production Process, North China Electric Power University
Hebei Electric Power Research Institute
Hebei Construction Investment Guorong Energy Service Co., Ltd
Inner Mongolia Electric Power Research Institute
School of Control and Computer Engineering, North China Electric Power University
0