您当前的位置:
首页 >
文章列表页 >
Failure analysis of flange used for urea hydrolysis equipment
Thermal Power Generation   Vol. 45, Issue 6, Pages: 111-115(2016)
更新时间:2025-09-28
    • Failure analysis of flange used for urea hydrolysis equipment

    • CLC: TQ113.2;TG142.71
    • Published:2016

    移动端阅览

  • HUANG Jinyang, YANG Zheng, LU Jintao, et al. Failure analysis of flange used for urea hydrolysis equipment[J]. Thermal Power Generation, 2016, 45(6): 111-115. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

150

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ANALYSIS OF REPAIR WHEN LEAKAGE OCCURRED ON FOUR KINDS OF TUBES IN THE BOILER OF 300MW UNIT
Pitting corrosion behavior of TP304 stainless steel in urban reclaimed water
PROBLEMS EXISTING IN OPERATION OF WET LIMESTONE/GYPSUM DESULFURATION SYSTEM IN LUOHUANG POWER PLANT AND ANALYSIS THEREOF
CAUSE ANALYSIS OF WATER-WALL TUBE BURST AND LEAKAGE FOR A 2100t/h BOILER
CAUSE ANALYSIS OF CORROSION FOR CHEMICAL-DOSING TUBE ENTERING INTO THE DRUM PORT

Related Author

LONG Huiguo
LONG Yi
CHEN HongdongHunan Provincial Electric Power Testing & Research Institute
ZHANG Guiquan
LIU Feng
LIN He
ZHANG Heng
WEN Huifeng

Related Institution

Hunan Electric Power Test and Research Institute
Huaneng Hainan Power Generation Co., Ltd. Dongfang Power Plant
Chongqing Electric Power College Chongqing
Shajiao C Power Plant
Guangdong Electric Power Test and Research Institute Dongguan
0