您当前的位置:
首页 >
文章列表页 >
Finite element analysis of transient stress in boiler drum during hot start-up process
Thermal Power Generation   Vol. 45, Issue 4, Pages: 76-83(2016)
更新时间:2025-09-28
    • Finite element analysis of transient stress in boiler drum during hot start-up process

    • CLC: TM621.2
    • Published:2016

    移动端阅览

  • LI Yong, XU Kaicheng. Finite element analysis of transient stress in boiler drum during hot start-up process[J]. Thermal Power Generation, 2016, 45(4): 76-83. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

104

下载量

7

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

STUDY ON TEMPERATURE FIELD MEASUREMENT IN FURNACE AND COMBUSTION DIAGNOSIS METHOD BASED ON DIGITAL IMAGE PROCESSING AND NEURAL NETWORK
STUDY ON SCHEME OF PREVENTING A 200T/H COALFIRING BOILER FROM SLAGGING PROBLEMS
OPTIMIZATION OF RUNBACK CONTROL LOGIC FOR SUBCRITICAL UNITS
Concentration correction based acoustic tomography of temperature and flow in a furnace
Finite element stress analysis for turbo-charged boiler drums based on direct and inverse heat conduction coupling method

Related Author

ZHANG Yu jie
Wu Ping lin
LU L ming
HU Dianru
ZHANG Bo
WEN Jun
ZHAO Jun1
HOU Liping2 1.Shenhua Guohua Electric Power Research Institute Co Ltd

Related Institution

Shaanxi University of Science and Technology
Jiaozuo Power Plant
Xianyang Samsung Power Equipment Manufacturing Co., Ltd.
Zhongdian Guohua Beijing Thermal Power Branch
0