您当前的位置:
首页 >
文章列表页 >
Optimization on control strategy of feedwater pump for a 300MW unit after frequency transformation
Thermal Power Generation   Vol. 44, Issue 10, Pages: 119-123(2015)
更新时间:2025-09-28
    • Optimization on control strategy of feedwater pump for a 300MW unit after frequency transformation

    • CLC: TM621
    • Published:2015

    移动端阅览

  • LI Junhong, LYU Ping, FENG Jiangtao, et al. Optimization on control strategy of feedwater pump for a 300MW unit after frequency transformation[J]. Thermal Power Generation, 2015, 44(10): 119-123. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

120

下载量

6

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Practical application and technical discussions of the first set of 1 000 MW domestic full-capacity feed pump unit
Control strategy for water wall overheat in a 1000MW ultra supercritical unit
Dynamic characteristics of high pressure low temperature economizer system when participating in load adjustment for double-reheat units
Discussions on tube bundle arrangement factor for condensers in steam turbines
Optimization of load control strategy for a supercritical 600MW unit boiler

Related Author

崔志勇
尚卫军
安宗武
胡永海
江飞
姜宏伟
唐永利
王海英

Related Institution

Guangdong Power Grid Co., Ltd. Electric Power Science Research Institute
Xi’an TPRI Energy Conservation Technology Co., Ltd.
College of Energy & Mechanical Engineering,Shanghai University of Electric Power
Shenzhen Cooperative Power Technology Co.,Ltd.
Huaneng Group Technology Innovation Center
0