Evaluation methods for vacuum tightness of wet cooling thermal power units suffering peaking operation
Thermal Power GenerationVol. 44, Issue 6, Pages: 63-67(2015)
更新时间:2025-09-28
分享给微信好友或者朋友圈
导出参考文献
Evaluation methods for vacuum tightness of wet cooling thermal power units suffering peaking operation
作者机构:
1. 西安热工研究院有限公司
2. 淮浙煤电有限责任公司凤台发电分公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2015
稿件说明:
移动端阅览
AN Xin, GE Zhenguo, LIU Lichun, et al. Evaluation methods for vacuum tightness of wet cooling thermal power units suffering peaking operation[J]. Thermal Power Generation, 2015, 44(6): 63-67.
DOI:
AN Xin, GE Zhenguo, LIU Lichun, et al. Evaluation methods for vacuum tightness of wet cooling thermal power units suffering peaking operation[J]. Thermal Power Generation, 2015, 44(6): 63-67.DOI:
Evaluation methods for vacuum tightness of wet cooling thermal power units suffering peaking operation
The vacuum tightness test was always used to evaluate the vacuum system's tightness for thermal power units with wet cooling.This method can evaluate the vacuum system's leakage rate effectively for units with average load rate of more than 80%
which ensures the unit economy.However
for units suffering from peak load operation
especially deep peak regulation
the existing industry standards have no specific rules on vacuum tightness evaluation methods for units under low load conditions.When the units are during peak load operation with low load
the condenser heat load
air entering the system
vacuum system and the total volume of vacuum suction device capacity changes will all affect the qualified value of vacuum tightness
to different degrees.Therefore
taking a supercritical 350 MW unit as an example
the qualitative evaluation method at low load of peak shaving and the quantitative correction methods considering the above factors were discussed.The results show that the qualified standard of the vaccum tightness of this unit under 60%load condition is 304Pa/min.This method is simple and has strong practicality
which can provide references for wet cooling units for which peak load operation has become norm state.
Economic Analysis on Recycling Waste heat of Auxiliary Equipment Circulating Water in supercritical 660 MW Units
Operation performance of PEM electrolyzer in dual-mode operation for hydrogen production and hot standby with integrated ammonia synthesis waste heat storage and utilization
Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units
Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit
Research progress of thermal energy storage technology in solar thermal power generation and combined heat and power generation
Related Author
YE Xuemin1
TONG Jialin1
WU Jie2
ZHAO Zhenning3
WANG Zhongping1 1.School of Energy
裴长运
孙名家
王桂楠
Related Institution
College of Energy, Power and Mechanical Engineering, North China Electric Power University
Ningxia Eastern Thermal Power Co., Ltd
North China Electric Power Research Institute Co., Ltd