您当前的位置:
首页 >
文章列表页 >
Preventive maintenance strategy for master fuel trip in thermal power plants
Thermal Power Generation   Vol. 44, Issue 3, Pages: 115-118(2015)
更新时间:2025-09-28
    • Preventive maintenance strategy for master fuel trip in thermal power plants

    • CLC: TK228
    • Published:2015

    移动端阅览

  • FU Yali, BAI Yan. Preventive maintenance strategy for master fuel trip in thermal power plants[J]. Thermal Power Generation, 2015, 44(3): 115-118. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

88

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

BRIEF DESCRIPTION OF THE NEGATIVE PRESSURE CONTROL SYSTEM FOR BOILERS IN SECONDPHASE PROJECT OF HUANENG FUZHOU POWER PLANT
OPTIMIZATION OF PID CONTROLLER PARAMETERS FOR MAIN STEAM TEMPERATURE BASED ON MULTI-OBJECTIVE GENETIC ALGORITHM AND MULTI-ATTRIBUTE DECISION MAKING
OPTIMIZATION OF THE CONTROL SYSTEM FOR CFB BOILER OF 330MW UNIT
RESEARCH AND APPLICATION OF DISTRIBUTED PREDICTIVE CONTROL IN BOILER COMBUSTION PROCESS
Quantitative analysis and multi-objective optimization of Brayton cycle based on artificial neural network method

Related Author

陈剑锋
王震皓
LI Xue-bin Wuhan 2nd Ship Design and Research Institute
ZHANG Zhenwei1
SANG Yongfu1
SONG Jiye2 1.Xi'an Thermal Power Research Institute Co Ltd
CHEN Tiejun
YANG Yang

Related Institution

Huaneng Fuzhou Power Plant
Huaneng Fuzhou Power Plant Fujian Changle
Fujian Changle
Wuhan Second Ship Design and Research Institute
Xi'an Thermal Power Research Institute Co., Ltd
0