您当前的位置:
首页 >
文章列表页 >
Optimization of bypass system control strategy for 2GT+1ST combined cycle power unit
Thermal Power Generation   Vol. 44, Issue 1, Pages: 106-111(2015)
更新时间:2025-09-28
    • Optimization of bypass system control strategy for 2GT+1ST combined cycle power unit

    • CLC: TM621
    • Published:2015

    移动端阅览

  • GAO Mingshuai, GAO Aiguo, CHEN Zhenshan. Optimization of bypass system control strategy for 2GT+1ST combined cycle power unit[J]. Thermal Power Generation, 2015, 44(1): 106-111. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

199

下载量

8

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

INSTALLATION AND TYPE-SELECTION OF THE BY-PASS SYSTEM FOR 600MW SUPERCRITICAL UNIT AT QINBEI POWER PLANT
OPERATION BEHAVIOR OF STARTUP SYSTEM FOR ONCETHROUGH BOILERS WITH BYPASS SYSTEM OF STEAM TURBINE AND SIMULATION THEREOF
OPTIMIZATION OF FAST CUT BACK(FCB) CONTROL FOR THE 330 MW UNIT IN INDONESIA INDRAMAYU POWER STATION
Optimization calculation for sliding pressure of steam turbine with extraction for heating
LVDT faults auto-monitoring technology for turbine governing valve based on video processing

Related Author

Huo Dongfang
多保林
侯书海
WANG Haitao Xi'an Thermal Power Research Institute Co.
WEN Le
YANG Xinmin
WANG Weifeng
XUE Zhiheng

Related Institution

Huaneng Qinbei Power Plant Henan Jiyuan
Nanhai Power Plant No.1
Huaneng Weihai Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
0