Variation of main steam pressure during initial stage of fast cut back under 100% load condition:a simulation research
Thermal Power Generation   Vol. 43, Issue 11, Pages: 69-74(2014)
更新时间:2025-09-28
    • Variation of main steam pressure during initial stage of fast cut back under 100% load condition:a simulation research

    • CLC: TM621
    • Published:2014

    移动端阅览

  • ZHOU Yunlong, WANG Di, CHEN Lijun. Variation of main steam pressure during initial stage of fast cut back under 100% load condition:a simulation research[J]. Thermal Power Generation, 2014, 43(11): 69-74. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

187

下载量

6

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Simulation and prediction of deaerator water level for a 1000MW unit under FCB condition
Modeling and simulation of economizer based on system dynamics
A two-stage cascade compound atomizing nozzle for biomass pyrolysis oil at room temperature:design and simulation
Real-time calculation model of calorific value of fuel for a coal-fired power plant
Model-free adaptive control of superheated steam temperature based on quantum-behaved particle swarm optimization

Related Author

DENG Shaoxiang
HUO Min
HU Niansu
WEI Le
MA Binbin
CHANG Tongli
ZHAO Yunjing
LIU Xuezhe

Related Institution

Guangdong Power Grid Corporation Electric Power Science Research Institute
School of Power and Mechanical Engineering, Wuhan University
School of Control and Computer Engineering, North China Electric Power University
School of Mechatronics Engineering,Northeast Forestry University
School of Automation and Information Engineering,Xi’an University of Technology
0