您当前的位置:
首页 >
文章列表页 >
Steam-water quality control points of a supercritical 660MW air cooling unit in construction period
Thermal Power Generation   Vol. 43, Issue 1, Pages: 140-141(2014)
更新时间:2025-09-28
    • Steam-water quality control points of a supercritical 660MW air cooling unit in construction period

    • CLC: TM621.8
    • Published:2014

    移动端阅览

  • LI Lujiang, SUN Xinli. Steam-water quality control points of a supercritical 660MW air cooling unit in construction period[J]. Thermal Power Generation, 2014, 43(1): 140-141. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

91

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Experimental study on banked fire for peak regulation of supercritical circulating fluidized bed units
Experimental study on start-stop peak regulation of a 350 MW supercritical circulating fluidized bed coal-fired power unit
Economic research on desulfurization and denitration for a supercritical 350 MW circulating fluidized bed boiler
Optimization and fixed value disturbance test analysis for coordination control system of a supercritical 660 MW unit
Technical schemes of improving operation performance of direct air-cooling units in summer:a review

Related Author

佟博恒
李玉
马乐乐
许永伟
赵彬彬
杨军
杨雪婷
李金晶

Related Institution

Shenhua Guoneng (Shendong Power) Group
Hebei Engineering Research Center of Simulation & Optimized Control for Power Generation,North China Electric Power University
Control Technology Department,Zhejiang Energy Group R&D
Xi'an Thermal Power Research Institute Co.,Ltd.
Hebei Guohua Dingzhou Power Generation Co.,Ltd.,Dingzhou
0