您当前的位置:
首页 >
文章列表页 >
Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures
Thermal Power Generation   Vol. 43, Issue 7, Pages: 139-142(2014)
更新时间:2025-09-28
    • Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures

    • CLC: TK268
    • Published:2014

    移动端阅览

  • GAN Chaoqi, LI Chunguang, WANG Yonggang. Over standard of main steam valve's closing time in a high-pressure steam turbine:reason analysis and countermeasures[J]. Thermal Power Generation, 2014, 43(7): 139-142. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

117

下载量

5

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS AND ELIMINATION OF ABNORMAL SHUT-OFF FOR MAIN STEAM VALVE OF SUBCRITICAL 600 MW STEAM TURBINE

Related Author

ZHANG Jun-jie1
SHI Chao-xi2
YUAN Jun1
DAI Yi-ping31.Beijing Guohua Electric Power Technological Centre

Related Institution

Beijing Guohua Electric Power Technology Center
Beijing Guohua Electric Power Company
Xi'an Jiaotong University
0