您当前的位置:
首页 >
文章列表页 >
Staging combustion retrofitting for a 300MW unit coal-fired boiler
Thermal Power Generation   Vol. 43, Issue 2, Pages: 125-128(2014)
更新时间:2025-09-28
    • Staging combustion retrofitting for a 300MW unit coal-fired boiler

    • CLC: TM621.2
    • Published:2014

    移动端阅览

  • ZHANG Chao, ZHANG Bing, LU Guangwu, et al. Staging combustion retrofitting for a 300MW unit coal-fired boiler[J]. Thermal Power Generation, 2014, 43(2): 125-128. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

127

下载量

5

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ANALYSIS OF ENERGY BALANCE FOR BOILERS
ANALYSIS OF UNCERTAINTY FOR THERMAL EFFICIENCY OF UTILITY BOILERS
ANALYSIS OF UNCERTAINTY IN BOILER THERMAL EFFICIENCY TEST
THE EFFECTS OF SEPARATING OVER-FIRED AIR SYSTEM FOR BOILERS EQUIPED IN GUOHUA TAI CANG POWER PLANT
APPLICATION OF MONTE-CARLO METHOD IN UNCERTAINTY EVALUATION FOR MEASUREMENT OF BOILER'S THERMAL EFFICIENCY

Related Author

XU Guofeng
ZHUANG Zhengning
XU Guofei
YANG Tao1
JU Lin-cang2
WU Sheng-lai11.Xi’an Thermal Power Research Institute Co Ltd
ZHANG Yong-sheng
MA Xiao-bin

Related Institution

Xi'an Jiaotong University
Liaoning Higher Normal College Xi'an
Xi'an Thermal Power Research Institute Co., Ltd
Hebei Electric Power Research Institute
0