您当前的位置:
首页 >
文章列表页 >
Sealing system optimization for air preheater in a 600 MW boiler
Thermal Power Generation   Vol. 42, Issue 10, Pages: 127-130(2013)
更新时间:2025-09-28
    • Sealing system optimization for air preheater in a 600 MW boiler

    • CLC: TK223.34
    • Published:2013

    移动端阅览

  • LIU Yongfeng, YU Dezhong, ZHANG Zhongzhou, et al. Sealing system optimization for air preheater in a 600 MW boiler[J]. Thermal Power Generation, 2013, 42(10): 127-130. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

113

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFFITTING OF SEALING-CLEARANCE CONTROL SYSTEM OF THE ROTARY AIR PREHEATOR
Calculation method of air preheater leakage rate for boiler mixedly burning pulverized coal and blast furnace gas
RETROFIT OF THE STATIONARY-PLATE TYPE REGENERATIVE AIR HEATER FOR 350 MW UNIT
OPTIMIZED RETROFIT OF AIR PREHEATER FOR BOILERS
Equipment modification for lignite co-firing in a 600MW unit boiler

Related Author

吴光明
方世清
YE Yalan
SI Fengqi
XU Zhigao
JIANG Wenhao
QIU Wan-fang
LIU Zhao

Related Institution

Ma'anshan Second Power Plant
Ma'anshan Second Power Plant Anhui Ma'anshan
Jiangsu Maritime Institute
Key Laboratory of Energy Thermal Conversion and Control of Ministry of Education,Southeast University
0