您当前的位置:
首页 >
文章列表页 >
Design and development of performance calculation configuration platform for power generating unit
Thermal Power Generation   Vol. 42, Issue 11, Pages: 145-148(2013)
更新时间:2025-09-28
    • Design and development of performance calculation configuration platform for power generating unit

    • CLC: TM31
    • Published:2013

    移动端阅览

  • WU Zhiqun, CHAI Shengkai, LIU Chaofei, et al. Design and development of performance calculation configuration platform for power generating unit[J]. Thermal Power Generation, 2013, 42(11): 145-148. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

50

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Modeling method for characterizing condenser system based on multi-fidelity data and transfer learning
Load prediction model for ultra-supercritical turbine power unit considering regenerative cycle characteristics
APPLICATION OF Simatic PCS7 DISTRIBUTED CONTROL SYSTEM ON GAS & STEAM TURBINE COMBINED CYCLE GENERATING UNIT
DEVELOPMENT AND APPLICATION OF HYDRAULIC TENSILE BOLTS FOR SHAFT COUPLINGS OF TURBO-GENERATOR SETS
REALIZATION AND APPLICATION OF REPORTING FUNCTION IN PI SYSTEM

Related Author

司风琪
卫子涵
翁琪航
朱保宇
任少君
张逸佳
CHENG Lei
MA Liangyu

Related Institution

School of Control and Computer Engineering, North China Electric Power University
Guodian Thermal Power Research Institute
Huaneng Shang'an Power Plant
Dongfang Turbine Factory
0