Allocation analysis of induced draft fans for coal-fired power plants with large capacity
Thermal Power Generation   Vol. 42, Issue 8, Pages: 116-118(2013)
更新时间:2025-09-28
    • Allocation analysis of induced draft fans for coal-fired power plants with large capacity

    • CLC: TK223.26
    • Published:2013

    移动端阅览

  • SONG Jingming, GONG Shuhong State Nuclear Electric Power Planning Design & Research Institute. Allocation analysis of induced draft fans for coal-fired power plants with large capacity[J]. Thermal Power Generation, 2013, 42(8): 116-118. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

58

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

THE FEASIBILITY OF DRIVING INDUCED DRAFT FAN USING STEAM TURBINE FOR 1000 MW ULTRA-SUPERCRITICAL UNIT
WATER-LEVEL CONTROL IN ULTRA-SUPERCRITICAL ONCE-THROUGH BOILER OF 1000 MW UNIT
ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT
DETECTION OF MATERIAL DEFECTS IN P92 STEEL MAIN STEAM PIPELINE OF ULTRA-SUPERCRITICAL UNIT
COMMISSIONING AND OPERATION OF 1000 MW ULTRA-SUPERCRITICAL ONCE-THROUGH BOILERS

Related Author

MA Xiaolong
LIU Chao Xi'an Thermal Power Research Institute Co Ltd
WU Yan-binHudian Zhouxian Power Plant
WANG Xin-ge
LI Hong-tao
LIANG Mao-chun Huadian Zouxian Power Plant
HOU Zhao-tang1
CAI Hui1

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Huadian Zouxian Power Plant
Huaneng Yuhuan Power Plant
Shandong Electric Power Research Institute
Dongfang Boiler (Group) Co., Ltd
0