您当前的位置:
首页 >
文章列表页 >
Reheater transformation for a 135 MW CFB boiler
Thermal Power Generation   Vol. 42, Issue 5, Pages: 76-79(2013)
更新时间:2025-09-28
    • Reheater transformation for a 135 MW CFB boiler

    • CLC: TK223.32
    • Published:2013

    移动端阅览

  • LI Qindao1, HU Zhihong2, HAO Weidong2, et al. Reheater transformation for a 135 MW CFB boiler[J]. Thermal Power Generation, 2013, 42(5): 76-79. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

80

下载量

7

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFIT OF PLATEN REHEATER FOR 480t/h CFB BOILER
niformity improvement for bed temperature of a 300 MW unit CFB boiler
STUDY ON OVER-TEMPERATURE OF PLATEN TYPE REHEATER FOR BOILERS WITH FOUR CORNER TANGENTIAL FIRING
NEW CALCULATION SOFTWARE AND ITS PRACTICAL APPLICATION FOR CALCULATING WALL TEMPERATURE OF HIGH TEMPERATURE CONVECTIVE HEATING SURFACE FOR A BOILER
TEST AND STUDY ON OVERTEMPERATURE TUBEBURST OF HEATING SURFACE FOR 670t/h BOILER IN ZHANGZE POWER PLANT

Related Author

YANG Yongbo1
DUAN Kening1
JIANG Jianzhong2
DONG Xuezhi1
GU Huxiong11.Xi'an Thermal Power Research Institute Co Ltd
HUANG Zhong
GUO Taixing
LIANG Jinlin

Related Institution

Zhongyan Jilantai Chlor Alkali Chemical Co., Ltd. Thermal Power Plant
Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Clean Energy Research Institute Co.,Ltd.
Shanxi International Energy Group Limited Company
Xinjiang Midong Thermal Power Plant,Shenhua Shendong Power Co.,Ltd.
0