您当前的位置:
首页 >
文章列表页 >
Half load rejection test for an ultra supercritical 1 000 MW unit: operations and control measures
Thermal Power Generation   Vol. 42, Issue 6, Pages: 78-81(2013)
更新时间:2025-09-28
    • Half load rejection test for an ultra supercritical 1 000 MW unit: operations and control measures

    • CLC: TK229.2
    • Published:2013

    移动端阅览

  • LIN Mindu, GUO Jie, QIN Xichao Guangdong Yudean Jinghai Power Generation Co.. Half load rejection test for an ultra supercritical 1 000 MW unit: operations and control measures[J]. Thermal Power Generation, 2013, 42(6): 78-81. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

195

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CONTROL STRATEGY OF PRIMARY FREQUENCY REGULATION AND ITS OPTIMIZATION FOR 2×600 MW ULTRA SUPERCRITICAL UNITS IN HEYUAN POWER PLANT
Exhaust coefficient method based analysis on influence of different spray desuperheating modes on unit thermal economy
Dynamic simulation model for ultra supercritical 1 000MW unit boilers
Steam temperature control during the unit startup with tiny-oil ignition
FEATURES OF MSW INCINERATION CONTROL IN STOCKER-FIRED BOILER

Related Author

WANG Yuanping1
WU Zhongsheng1
HUANG Huayu1
LI Enpeng1
YI Yongzhi1
HANG Yu2 1.Shenzhen Energy Hopewell Power(Heyuan) Co.
ZHOU Zhenqi1
LI Xiaodong1

Related Institution

Shenneng Hehe Electric Power (Heyuan) Co., Ltd
Northwest Electric Power Design Institute
School of Energy and Power Engineering, Northeast Electric Power University
Jilin Electric Power Co., Ltd. Siping Thermal Power Company
School of Control and Computer Engineering, North China Electric Power University
0