您当前的位置:
首页 >
文章列表页 >
Realization of automatic start and stop of high pressure heaters
Thermal Power Generation   Vol. 42, Issue 7, Pages: 115-117(2013)
更新时间:2025-09-28
    • Realization of automatic start and stop of high pressure heaters

    • CLC: TM621
    • Published:2013

    移动端阅览

  • XIAO Sheng Xi'an Thermal Power Research Institute Co.. Realization of automatic start and stop of high pressure heaters[J]. Thermal Power Generation, 2013, 42(7): 115-117. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

83

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

STUDY ON APPLICATION OF NEW TYPE NEURAL NETWORK IN CONTROL OF COAL PULVERIZING SYSTEM WITH BALL MILLS
BREAKDOWN FAULT ANALYSIS OF HIGH PRESSURE HEATER IN SUB-CRITICAL 600 MW GENERATING UNIT
WAYS FOR REDUCING TEMPERATURE RISE OF THE BEARING SHOES FOR MTZ 3560 TYPE COAL PULVERIZER
FEATURES OF MSW INCINERATION CONTROL IN STOCKER-FIRED BOILER
APPLICATION OF FREQUENCY CONVERTOR IN CONTROLLER FOR FUEL TRANSPORTING SYSTEM AT THERMAL POWER PLANT

Related Author

LIU Jiu-bin
CHENG Hong
ZHU Ke
ZHAO Jun 1.Shaanxi Guohua Jinjie Energy Co.Ltd.
YANG Zhongming
HU Xuejun
ZEN Wei-dong
XUE Xian-min

Related Institution

Nanjing Institute of Technology
Shaanxi Guohua Jinjie Energy Co., Ltd
Beijing Guohua Electric Power Technology Research Center Co., Ltd
Sheyang Port Power Generation Co., Ltd
Sheyang Port Power Generation Co., Ltd. Jiangsu Sheyang
0