Gradual bend occurred on HP-IP rotor in 600MW level unit : fault diagnosis and treatment
Thermal Power Generation   Vol. 42, Issue 7, Pages: 105-108(2013)
更新时间:2025-09-28
    • Gradual bend occurred on HP-IP rotor in 600MW level unit : fault diagnosis and treatment

    • CLC: TK268
    • Published:2013

    移动端阅览

  • ZHANG Junjie1, CUI Yahui 1, ZHOU Feng2, et al. Gradual bend occurred on HP-IP rotor in 600MW level unit : fault diagnosis and treatment[J]. Thermal Power Generation, 2013, 42(7): 105-108. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

136

下载量

10

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

SIMULATION AND EMULATION SYSTEM OF SERVICE LIFE PREDICTION FOR ROTOR OF STEAM TURBINE
CAUSES LEADING TO OVER-TEMPERATURE OF SUPERHEATER FOR BOILERS OF SUPERCRITICAL 600MW UNITS AT INITIAL STAGE OF START-UP AND CONTROL THEREOF
ANALYSIS AND DISPOSAL OF VIBRATION ON ULTRA-SUPERCRITICAL TURBO-GENERATOR SET
ANALYSIS OF OPERATING STATUS FOR HOME-MADE SUPERCRITICAL 600MW UNITS
ECONOMIC EFFICIENCY OF RATED-SLIDING-PRESSURE OPERATION FOR 600 MW UNITS IN TAISHAN POWER PLANT

Related Author

王琪
梁志宏
岳建华
肖志刚
张丽萍
CHEN Xing
LI Hong-pingXinyang Huayu Power Generation Co Ltd
CHEN Hua-gui1

Related Institution

Inner Mongolia Electric Power Research Institute
North China Electric Power University
Inner Mongolia Electric Power Research Institute Hohhot
Datang Xinyang Huayu Power Generation Co., Ltd
0