您当前的位置:
首页 >
文章列表页 >
Measurement and analysis of tube wall temperature for heating surface of an ultra-supercritical 1 000MW unit boiler
Thermal Power Generation   Vol. 42, Issue 7, Pages: 118-122(2013)
更新时间:2025-09-28
    • Measurement and analysis of tube wall temperature for heating surface of an ultra-supercritical 1 000MW unit boiler

    • CLC: TK31;TK229.2
    • Published:2013

    移动端阅览

  • DU Baohua1, WANG Dapeng1, DONG Lei 1, et al. Measurement and analysis of tube wall temperature for heating surface of an ultra-supercritical 1 000MW unit boiler[J]. Thermal Power Generation, 2013, 42(7): 118-122. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

243

下载量

13

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Research on coupling calculation method of combustion and hydrodynamics for water walls in ultra-supercritical double-reheat boilers
Practice and optimization of combined pipe-blowing method for domestic first double-reheat unit
Arrangement optimization for temperature measuring points on tube wall of (ultra) supercritical boilers
Influences of flue gas recirculation on thermal hydrodynamic and water wall temperature distribution in an ultra-supercritical double-reheat boiler
Experimental study on growth rate of oxide scale on superheater and reheater tubes in ultra-supercritical units

Related Author

DONG Jiancong
ZHANG Zhongxiao
FAN Haojie
GE Xueli
ZHANG Jian
GAO Jinghui
WANG Lin
YANG Bo

Related Institution

Thermal Energy Engineering Institute, Shanghai Jiao Tong University
Xi’an Thermal Power Research Institute Co., Ltd.
Shenhua Guohua Electric Power Research Institute Company Limitied
Huaizhe Power Fengtai Branch Co.,Ltd.
Wuhan Boiler Co., Ltd., Wuhan Boiler Co., Ltd., Wuhan Boiler Co., Ltd., Wuhan Boiler Co., Ltd., Hubei Wuhan 430070, Hubei Wuhan 430070, Hubei Wuhan 430070
0