Analysis and optimization on run back control strategy for unit with CFB boiler
Thermal Power Generation   Vol. 42, Issue 2, Pages: 74-81(2013)
更新时间:2025-09-28
    • Analysis and optimization on run back control strategy for unit with CFB boiler

    • CLC: TK32
    • Published:2013

    移动端阅览

  • WANG Fei, HE Jinqi Northwest Power Construction Commissioning Institute. Analysis and optimization on run back control strategy for unit with CFB boiler[J]. Thermal Power Generation, 2013, 42(2): 74-81. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

152

下载量

6

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ANALYSIS OF TRIAL OPERATION RELATING TO FEED-WATER PUMPS OF 300 MW UNIT IN GUANG'AN POWER PLANT
DESIGN AND TEST OF RB CONTROL FOR 300 MW UNITS
TEST STUDY ON COMBUSTION ADJUSTMENT OF ONE CFB BOILER FOR 300 MW UNIT
Practical application and technical discussions of the first set of 1 000 MW domestic full-capacity feed pump unit
Review of fault monitoring and diagnosis for induced draft fans in power stations

Related Author

PENG Yi
QU Guang-hao
LIU Shu-jie
ZHONG Li1
XU Zhengquan1
CAO Xingwei2
ZHANG Li2
QIU Zhong2

Related Institution

Guang'an Power Plant Sichuan Guang'an
Huaneng Dezhou Power Plant
Huaneng Clean Energy Technology Research Institute Co., Ltd
Xinjiang Midong Thermal Power Plant
Xi’an TPRI Energy Conservation Technology Co., Ltd.
0