您当前的位置:
首页 >
文章列表页 >
UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT
Thermal Power Generation   Vol. 41, Issue 12, Pages: 109-110(2012)
更新时间:2025-09-28
    • UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT

    • CLC: TH38
    • Published:2012

    移动端阅览

  • LU Hongying1, LU Jianlin2 1.Power Engineering Department. UPGRADING OF DG185-385 FEED WATER PUMP FOR A POWER PLANT[J]. Thermal Power Generation, 2012, 41(12): 109-110. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

38

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Practical application and technical discussions of the first set of 1 000 MW domestic full-capacity feed pump unit
A preliminary study of turbine in solar chimney power generation system associated with seawater desalination
A TENTATIVE IDEA FOR ENHANCING THE HIGI-PRESSURE HEATER'S RELIABILITY OF LARGE-SCALE UNITS
APPLICATION AND IMPROVEMENT OF KSB FEED-WATER PUMPS IN SHOUYANGSHAN POWER PLANT

Related Author

崔志勇
尚卫军
安宗武
胡永海
江飞
姜宏伟
唐永利
王海英

Related Institution

Key Laboratory of Condition Monitoring and Control for Power Plant Equipment, Ministry of Education, North China Electric Power University
College of Energy and Electrical Engineering, Hohai University
Jiaozuo Power Plant
Rizhao Power Plant
0