您当前的位置:
首页 >
文章列表页 >
ANALYSIS AND DISPOSAL OF VIBRATION FAULT IN DEBUGGING PERIOD OF 600 MW UINT
Thermal Power Generation   Vol. 41, Issue 7, Pages: 89-91(2012)
更新时间:2025-09-28
    • ANALYSIS AND DISPOSAL OF VIBRATION FAULT IN DEBUGGING PERIOD OF 600 MW UINT

    • CLC: TM311
    • Published:2012

    移动端阅览

  • LU Shuanglong1, YANG Jiangang2, WANG Shushen1, et al. ANALYSIS AND DISPOSAL OF VIBRATION FAULT IN DEBUGGING PERIOD OF 600 MW UINT[J]. Thermal Power Generation, 2012, 41(7): 89-91. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

104

下载量

6

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ANALYSIS OF VIBRATION PROBLEM FOR HOME - MADE 600 MW SUPERCRITICAL TURBO - GENERATOR SET AND TREATMENT THEREOF
VIBRATION DISPOSAL OF 2×600 MW AIR-COOLED UNITS
FEATURES OF SHAFTING SYSTEM FOR THE FIRST SUPERCRITICAL 600MW TURBO-GENERATOR SET MANUFACTURED BY BAPE CORPORATION,AS WELL AS VIBRATION ANALYSIS AND DISPOSAL THEREOF
CAUSES LEADING TO OVER-TEMPERATURE OF SUPERHEATER FOR BOILERS OF SUPERCRITICAL 600MW UNITS AT INITIAL STAGE OF START-UP AND CONTROL THEREOF
ANALYSIS AND DISPOSAL OF VIBRATION ON ULTRA-SUPERCRITICAL TURBO-GENERATOR SET

Related Author

张学延
张卫军
周亮
钮宾
王延博
葛祥
陈国军
曲志中

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Huaneng Qinbei Power Generation Co., Ltd
Shaanxi Weihe Power Generation Co., Ltd
Pingwei Second Power Generation Co., Ltd
Beizhong Alstom (Beijing) Electrical Equipment Co., Ltd
0