您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF CONTROL SYSTEM FOR A 300 MW UNIT WITH CIRCULATING FLUIDIZED BED BOILER
Thermal Power Generation   Vol. 41, Issue 9, Pages: 68-71(2012)
更新时间:2025-09-28
    • OPTIMIZATION OF CONTROL SYSTEM FOR A 300 MW UNIT WITH CIRCULATING FLUIDIZED BED BOILER

    • CLC: TK229.66
    • Published:2012

    移动端阅览

  • CHEN Bingyi Fujian Electric Power Research Institute. OPTIMIZATION OF CONTROL SYSTEM FOR A 300 MW UNIT WITH CIRCULATING FLUIDIZED BED BOILER[J]. Thermal Power Generation, 2012, 41(9): 68-71. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

98

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

OPTIMIZATION OF AIR DISTRIBUTION IN BOILER OF 300 MW UNIT
FEATURES OF PIPE-BLOWING FOR CFB BOILER AND STUDY ON ITS OPERATION MODE
CONTROL OF CFB BOILER IN LOAD REJECTION TEST OF 300 MW UNIT
OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
DESIGN OF CONTROL SYSTEM FOR HOMEMADE 410 t/h CFB BOILERS

Related Author

HE Yingguang Datang Honghe Power Generation Co Ltd
GONG Peng
MI Zide
ZHANG Qingfeng North China Electric Power Science Research Institute Co Ltd
LIU Jixiang1
ZHENG Zonghui1
GUO Tao1
DONG Zhiqian2 1.Gansu Electric Power Science Research Institute

Related Institution

Datang Honghe Power Generation Co., Ltd
North China Electric Power Research Institute Co., Ltd
Gansu Electric Power Research Institute
Jingmei Fenghuangling Power Plant
North China Electric Power University
0