您当前的位置:
首页 >
文章列表页 >
DIAGNOSIS OF INTERMITTENT VIBRATION ON PRIMARY AIR FAN OF SUPERCRITICAL BOILER
Thermal Power Generation   Vol. 41, Issue 8, Pages: 56-58(2012)
更新时间:2025-09-28
    • DIAGNOSIS OF INTERMITTENT VIBRATION ON PRIMARY AIR FAN OF SUPERCRITICAL BOILER

    • CLC: TK223.26
    • Published:2012

    移动端阅览

  • GUO Yujie1, REN Guangyin2, LIU Zhanhui1, et al. DIAGNOSIS OF INTERMITTENT VIBRATION ON PRIMARY AIR FAN OF SUPERCRITICAL BOILER[J]. Thermal Power Generation, 2012, 41(8): 56-58. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

120

下载量

11

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

APPLICATION OF ABB UVISOR FLAME DETECTING SYSTEM IN HUARUN DENGFENG POWER PLANT
OPTIMIZATION OF RUNBACK CONTROL LOGIC FOR SUBCRITICAL UNITS
TUBE ABRASION ON HEAT RECOVERY SURFACE IN TAIL SECTION OF BOILERS AND DISPOSAL METHOD THEREOF
Type selection of frimary,secondary air fans and induced draft fans for boiler in biomass power plants
CAUSES LEADING TO SLAGGING IN FURNACE OF TANGENTIAL FIRING PULVERIZED COAL BOILER AND PREVENTIVE MEASURES THEREOF

Related Author

LI xian-zhong1
Wang Guo-kun2
XUE Zhao-wei21.Department of Power Engineering
ZHAO Jun1
HOU Liping2 1.Shenhua Guohua Electric Power Research Institute Co Ltd
LI Qingyi Huaneng Dezhou Power Plant
DUAN Yuyan Guangdong Electric Power Design Institute
HU Min

Related Institution

Zhengzhou Electric Power College Power Engineering Department
China Resources Power Dengfeng Co., Ltd
Shenhua Guohua Electric Power Research Institute Co., Ltd
Shanxi Electric Power Company
Huaneng Dezhou Power Plant
0