您当前的位置:
首页 >
文章列表页 >
TUBE BURST OF FINAL REHEATER ON BOILER OF A 1 000 MW ULTRA SUPERCRITICAL UNIT:CAUSE ANALYSIS
Thermal Power Generation   Vol. 41, Issue 10, Pages: 69-72(2012)
更新时间:2025-09-28
    • TUBE BURST OF FINAL REHEATER ON BOILER OF A 1 000 MW ULTRA SUPERCRITICAL UNIT:CAUSE ANALYSIS

    • CLC: TK228
    • Published:2012

    移动端阅览

  • QIN Chengpeng1, WANG Liang1, LI Liang1, et al. TUBE BURST OF FINAL REHEATER ON BOILER OF A 1 000 MW ULTRA SUPERCRITICAL UNIT:CAUSE ANALYSIS[J]. Thermal Power Generation, 2012, 41(10): 69-72. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

165

下载量

13

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Fireside corrosion behavior of HR3C steel in simulated coal-fired boiler atmospheres with high sulfur concentration
ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT
STUDY ON CONSTRUCTION OF HEAT RELEASE SIGNAL FOR ULTRA-SUPERCRITICAL UNITS
SCALING ON THROTTLE PLATE OF THE WATER-WALL IN BOILER FOR ULTRA-SUPERCRITICAL UNIT AND DISPOSAL THEREOF
STUDY ON LIFE MANAGEMENT TECHNOLOGY FOR BOILERS OF ULTRA-SUPERCRITICAL 1000MW UNTIS

Related Author

LI Jiang
ZHOU Rongcan
TANG Liying
BI Kai
WANG Xin-ge
LI Hong-tao
LIANG Mao-chun Huadian Zouxian Power Plant
SUN Qun-li

Related Institution

Xi'an Thermal Power Research Institute Co.,Ltd.
Huadian Zouxian Power Plant
College of Energy and Power Engineering, North China Electric Power University
Huaneng Yuhuan Power Plant
Guangzhou Yueneng Electric Power Technology Development Co., Ltd
0