您当前的位置:
首页 >
文章列表页 >
TEMPERATURE DEVIATION BETWEEN MAIN AND REHEAT STEAM AND TUBE-WALL OVERTEMPERATURE FOR TANGENTIALLY-FIRED BOILER: ANALYSIS AND TREATMENT
Thermal Power Generation   Vol. 41, Issue 8, Pages: 48-50(2012)
更新时间:2025-09-28
    • TEMPERATURE DEVIATION BETWEEN MAIN AND REHEAT STEAM AND TUBE-WALL OVERTEMPERATURE FOR TANGENTIALLY-FIRED BOILER: ANALYSIS AND TREATMENT

    • CLC: TK227
    • Published:2012

    移动端阅览

  • SUN Yuying1, WANG Zhigang2, CHEN Guohui2 1.Beijing University of Technology. TEMPERATURE DEVIATION BETWEEN MAIN AND REHEAT STEAM AND TUBE-WALL OVERTEMPERATURE FOR TANGENTIALLY-FIRED BOILER: ANALYSIS AND TREATMENT[J]. Thermal Power Generation, 2012, 41(8): 48-50. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

214

下载量

11

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
CAUSE ANALYSIS AND COUNTERMEASURES FOR BURST-CRACKING OF PLATEN SUPERHEATER OF BOILER NO.1
CAUSE ANALYSIS OF TUBE-WALL TEMPERATURE OVERRUN IN THE FINAL-STAGE SUPERHEATER OF SG2080/25.4-M969 TYPE BOILER AND DISPOSAL THEREOF
Operation optimization for retrofitted 1025 t/h boiler and experimental study on its NOx emission
Staging combustion retrofitting for a 300MW unit coal-fired boiler

Related Author

LIU Tong
XU Gang
ZHANG Min-qi
XUE Jia-lin
GAO Shang-de
FENG Qiang1
HUANG Xiangbin1
WEI Tongsheng2

Related Institution

North China Electric Power University
North China Electric Power University Beijing
Hancheng Power Plant
Guohua Cangdong Power Generation Co., Ltd
0