您当前的位置:
首页 >
文章列表页 >
EXERGY ANALYSIS FOR EFFICIENCY ENHANCEMENT OF THE 135 MW UNIT WITH CFB BOILER
Thermal Power Generation   Vol. 41, Issue 10, Pages: 13-17(2012)
更新时间:2025-09-28
    • EXERGY ANALYSIS FOR EFFICIENCY ENHANCEMENT OF THE 135 MW UNIT WITH CFB BOILER

    • CLC: TK229.66
    • Published:2012

    移动端阅览

  • LI Bin1, 2, LI Jianfeng2, et al. EXERGY ANALYSIS FOR EFFICIENCY ENHANCEMENT OF THE 135 MW UNIT WITH CFB BOILER[J]. Thermal Power Generation, 2012, 41(10): 13-17. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

257

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

OPERATIONAL PRACTICE OF FIRSTLY HOMEMADE 100MW CFB BOILER IN FENGYI POWERGENERATION COMPANY
TEST STUDY ON ASPHALTITEBURNING IN CFB AND EMISSION CHARACTERISTICS THEREOF
DETERMINATION OF TARGET VALVE FOR STEAM TURBINE'S CYLINDER EFFICIENCY
COMBUSTION OPTIMIZATION MODELLING FOR UTILITY BOILERS BASED ON GENERALIZED DYNAMIC FUZZY NEURAL NETWORKS
FEATURES AND PERFORMANCE OF ULTRA-SUPERCRITICAL 660MW STEAM TURBINES

Related Author

张敏
王智微
王鹏利
王海涛
高洪培
肖平
蒋敏华
张康道

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Xi'an Thermal Power Research Institute Co.,Ltd.
Xi'an electricity College
School of Electrical Engineering, Zhejiang University
0