您当前的位置:
首页 >
文章列表页 >
CONTROL OF CFB BOILER IN LOAD REJECTION TEST OF 300 MW UNIT
Thermal Power Generation   Vol. 41, Issue 5, Pages: 73-76(2012)
更新时间:2025-09-28
    • CONTROL OF CFB BOILER IN LOAD REJECTION TEST OF 300 MW UNIT

    • CLC: TK229.66
    • Published:2012

    移动端阅览

  • LIU Jixiang1, ZHENG Zonghui1, GUO Tao1, et al. CONTROL OF CFB BOILER IN LOAD REJECTION TEST OF 300 MW UNIT[J]. Thermal Power Generation, 2012, 41(5): 73-76. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

71

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

OPTIMIZATION OF AIR DISTRIBUTION IN BOILER OF 300 MW UNIT
AUTOMATIC CONTROL SYSTEM OF SCR FLUE GAS DENITRIFICATION AND ITS APPLICATION IN SANHE POWER PLANT
CONTROL STRATEGY OF 300 MW UNITS EQUIPPED WITH CFB BOILERS
FEATURES OF PIPE-BLOWING FOR CFB BOILER AND STUDY ON ITS OPERATION MODE
OPTIMIZATION OF CONTROL SYSTEM FOR A 300 MW UNIT WITH CIRCULATING FLUIDIZED BED BOILER

Related Author

HE Yingguang Datang Honghe Power Generation Co Ltd
LI Feng
WANG Li
GAO Fu-chun Xi’an Co Ltd of North China Electric Power Science Research Institute
MEI Sheng1
HAO Defeng2 1.Ma'anshan Wannengda Power Generation Co Ltd
GONG Peng
MI Zide

Related Institution

Datang Honghe Power Generation Co., Ltd
North China Electric Power Research Institute Xi'an Co., Ltd
Ma'anshan Wannengda Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
North China Electric Power Research Institute Co., Ltd
0