您当前的位置:
首页 >
文章列表页 >
AIR PREHEATER BLOCKING IN BOILER WITH SCR DENITRIFICATION DEVICE:REASON ANALYSIS AND SOLUTIONS
Thermal Power Generation   Vol. 41, Issue 8, Pages: 45-47(2012)
更新时间:2025-09-28
    • AIR PREHEATER BLOCKING IN BOILER WITH SCR DENITRIFICATION DEVICE:REASON ANALYSIS AND SOLUTIONS

    • CLC: TK223.34
    • Published:2012

    移动端阅览

  • ZHONG Lijin1, SONG Yubao2 1.Zhuhai Power Station of Guangdong Yudean Group Co.. AIR PREHEATER BLOCKING IN BOILER WITH SCR DENITRIFICATION DEVICE:REASON ANALYSIS AND SOLUTIONS[J]. Thermal Power Generation, 2012, 41(8): 45-47. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1105

下载量

124

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Formation mechanism and influencing factors of ammonium bisulfate during the selective catalytic reduction process
Variation characteristics of coal ash in an ultra supercritical 1000MW unit equipped with SCR denitration device
Numerical simulation and experimental study of ammonia-coal co-firing in a 4 MW boiler
ANALYSIS OF PLATE-TURNOVER PHENOMENON CONCERNING RUDUCTION GEARBOX OF 29-VI(T) 1780 TYPE AIR PREHEATER SURPASSING THE CLUTCH COUPLING AND TECHNICAL RETROFITTING OF THE STARTING-UP CIRCUIT
INFLUENCE OF SCR DENITRIFICATION FACILITY UPON THE BOILER STRUCTURE

Related Author

MA Shuangchen
GUO Meng
SONG Huihui
CHEN Gongda
YANG Jiehong
ZANG Bin
LI Zhao
LIU Yanfeng

Related Institution

College of Environmental Science and Engineering, North China Electric Power University
College of Energy, Power and Mechanical Engineering, North China Electric Power University
西安热工研究院有限公司
中国矿业大学低碳能源与动力工程学院
华能(天津)煤气化发电有限公司
0