CAUSE ANALYSIS OF TUBE-BURST ON PLATEN SUPERHEATER OF BOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
Thermal Power Generation   Vol. 40, Issue 11, Pages: 91-94(2011)
更新时间:2025-09-28
    • CAUSE ANALYSIS OF TUBE-BURST ON PLATEN SUPERHEATER OF BOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT

    • CLC: TK223.32
    • Published:2011

    移动端阅览

  • MA Chong, CHEN Shaoyu Technological Center under Tianjin City Electric Power Company. CAUSE ANALYSIS OF TUBE-BURST ON PLATEN SUPERHEATER OF BOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT[J]. Thermal Power Generation, 2011, 40(11): 91-94. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

162

下载量

12

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
ANALYSIS OF SUPERHEATER'S TUBE-BURST CAUSED BY FALLING-AWAY OF OXIDE SKIN
CAUSE ANALYSIS AND PREVENTIVE MEASURES FOR TUBE-BURST ON HIGH-TEMPERATURE SUPERHEATER OF BOILERS
RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER
DEVELOPMENT AND APPLICATION OF REMOTE MONITORING SYSTEM FOR CHEMICALS DOSING IN WATER TREATMENT OF POWER PLANTS

Related Author

LUO Sheng
LI Yao-jun
GAO HuiYangcheng Power Generation Co Ltd
NIU Shuyun1
LI Sheng1
JIANG Jianzhong2 1.Datang Honghe Power Generation Co Ltd
XU Ting
YANG Wansheng

Related Institution

The Pearl River Power Plant Guangdong
Xi'an Thermal Power Research Institute Co.,Ltd.
Yangcheng Power Generation Co., Ltd
Datang Honghe Power Generation Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
0