您当前的位置:
首页 >
文章列表页 >
STUDY ON THE HEAT TRANSFER PROCESS OF ASH AND SLAG IN SLAG COOLER OF LARGE-CAPACITY CFB BOILER
Thermal Power Generation   Vol. 40, Issue 10, Pages: 13-16(2011)
更新时间:2025-09-28
    • STUDY ON THE HEAT TRANSFER PROCESS OF ASH AND SLAG IN SLAG COOLER OF LARGE-CAPACITY CFB BOILER

    • CLC: TK229.6
    • Published:2011

    移动端阅览

  • LIU Ping, ZHOU Tao Institute of Nuclear Thermal Power and Standardization. STUDY ON THE HEAT TRANSFER PROCESS OF ASH AND SLAG IN SLAG COOLER OF LARGE-CAPACITY CFB BOILER[J]. Thermal Power Generation, 2011, 40(10): 13-16. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

180

下载量

6

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

ANTI-WEAR TECHNOLOGY FOR CFB BOILERS
DESIGN RESEARCH AND PROJECT DEMONSTRATION OF THE FIRT HOME-MADE 210 MW CFB BOILER
PROBLEMS EXISTING IN AIR-WATER COMBINED SLAG COOLER FOR CFB BOILERS AND HANDLING MEASURES THEREOFF
Online soft measurement of NOx mass concentration for circulating fluidized bed boiler based on BP neural network
Combustion and emission characteristics of Romania Rovinari lignite in circulating fluidized bed boiler

Related Author

QIAN Yu1
ZHANG Min2
LI Li-quan31.Branch Company No.2 under Henan Nanfu Electric Power Co Ltd
SUN Xian-bin
JIANG Min-hua
YU Long
LI Guang-hua
JIANG Yuan-jian

Related Institution

Henan Zhongfu Electric Power Co., Ltd
Xi'an Thermal Power Research Institute Co., Ltd
Henan Thermal Power Construction First Company
harbin boiler company limited
China Power Investment Corporation
0