您当前的位置:
首页 >
文章列表页 >
STUDY ON OPERATION OPTIMIZATION OF CIRCULATING WATER SYSTEM FOR 1250MW IN AP1000 NUCLEAR POWER PLANT
Thermal Power Generation   Vol. 39, Issue 11, Pages: 65-68(2010)
更新时间:2025-09-28
    • STUDY ON OPERATION OPTIMIZATION OF CIRCULATING WATER SYSTEM FOR 1250MW IN AP1000 NUCLEAR POWER PLANT

    • CLC: TM623.4
    • Published:2010

    移动端阅览

  • SHAO Shufeng China Electric Energy Complete Set Equipment Co Ltd. STUDY ON OPERATION OPTIMIZATION OF CIRCULATING WATER SYSTEM FOR 1250MW IN AP1000 NUCLEAR POWER PLANT[J]. Thermal Power Generation, 2010, 39(11): 65-68. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

268

下载量

6

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

No data

Related Author

No data

Related Institution

No data
0