您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF
Thermal Power Generation   Vol. 39, Issue 11, Pages: 53-56(2010)
更新时间:2025-09-28
    • ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF

    • CLC: TK267
    • Published:2010

    移动端阅览

  • TONG Xiaozhong1, ZHANG Bao1, ZHOU Yizhe2, et al. ANALYSIS OF ABNORMAL FAST-CLOSING PROCESS FOR REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE AND DISPOSAL THEREOF[J]. Thermal Power Generation, 2010, 39(11): 53-56. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

105

下载量

5

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF BOLT GROUP FAILURE ON REHEATED STEAM CONTROL VALVE OF THE STEAM TURBINE

Related Author

QIAO Lijie
GUO Yanjun Huadian Electric Power Science Research Institute

Related Institution

Huadian Electric Power Research Institute
0