APPLICATION OF FIELD BUS CONTROL SYSTEM IN SUBCONTROL WORKSHOP OF 1000 MW UNTIS
Thermal Power GenerationVol. 40, Issue 2, Pages: 72-75(2011)
更新时间:2025-09-28
分享给微信好友或者朋友圈
导出参考文献
APPLICATION OF FIELD BUS CONTROL SYSTEM IN SUBCONTROL WORKSHOP OF 1000 MW UNTIS
作者机构:
西安热工研究院有限公司
作者简介:
基金信息:
DOI:
CLC:TM621
Published:2011
稿件说明:
移动端阅览
CUI Yiqun, JING Xiaoguo Xi'an Thermal Power Research Institute Co Ltd. APPLICATION OF FIELD BUS CONTROL SYSTEM IN SUBCONTROL WORKSHOP OF 1000 MW UNTIS[J]. Thermal Power Generation, 2011, 40(2): 72-75.
DOI:
CUI Yiqun, JING Xiaoguo Xi'an Thermal Power Research Institute Co Ltd. APPLICATION OF FIELD BUS CONTROL SYSTEM IN SUBCONTROL WORKSHOP OF 1000 MW UNTIS[J]. Thermal Power Generation, 2011, 40(2): 72-75.DOI:
APPLICATION OF FIELD BUS CONTROL SYSTEM IN SUBCONTROL WORKSHOP OF 1000 MW UNTIS
The field bus control system FCS165 has been presented.It's embeded type Profibus communication master station modules FPB01 constitute a complete Profibus field bus control system.The application of said control system in subcontrol workshop of 2×1 000 MW units in Huaneng Jinling Power Plant shows that the said control system can realize two-way communication between PLC and monitoring software iFix
as well as inter connection and inter operation between systems
the operation of system is stable
satisfying the control requirements in the water-purifying station and in wastewater treatment system.