您当前的位置:
首页 >
文章列表页 >
RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER
Thermal Power Generation   Vol. 39, Issue 11, Pages: 49-50(2010)
更新时间:2025-09-28
    • RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER

    • CLC: TK229.6
    • Published:2010

    移动端阅览

  • NIU Shuyun1, LI Sheng1, JIANG Jianzhong2 1.Datang Honghe Power Generation Co Ltd. RETROFIT OF FABRIC EXPANSION JOINT IN RETURN CHUTE OF 300MW CFB BOILER[J]. Thermal Power Generation, 2010, 39(11): 49-50. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

102

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF TUBE-BURST ON PLATEN SUPERHEATER OF BOILER EQUIPPED FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES
CALCULATION OF WALL-TEMPERATURE FOR SUPERHEATER AND REHEATER OF HG670/13.7-YM13 TYPE BOILER
ANALYSIS OF SUPERHEATER'S TUBE-BURST CAUSED BY FALLING-AWAY OF OXIDE SKIN
CAUSE ANALYSIS OF LEAKAGE ACCIDENTS FOR “FOUR KINDS OF TUBES” AND COUNTERMEASURES THEREOF

Related Author

MA Chong
CHEN Shaoyu Technological Center under Tianjin City Electric Power Company
LUO Sheng
LIU Tong
XU Gang
LI Yao-jun
LI Peihua
HE Dongrong

Related Institution

Tianjin Electric Power Company Technology Center
The Pearl River Power Plant Guangdong
North China Electric Power University Beijing
North China Electric Power University
0