RETROFIT OF PRE-TREATMENT SYSTEM IN SHANGDU POWER PLANT
Thermal Power Generation   Vol. 39, Issue 6, Pages: 62-64(2010)
更新时间:2025-09-28
    • RETROFIT OF PRE-TREATMENT SYSTEM IN SHANGDU POWER PLANT

    • CLC: TM621.8
    • Published:2010

    移动端阅览

  • ZHU Xuebing, MAO Jin, ZHANG Jiangtao, et al. RETROFIT OF PRE-TREATMENT SYSTEM IN SHANGDU POWER PLANT[J]. Thermal Power Generation, 2010, 39(6): 62-64. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

81

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

DEVELOPMENT AND APPLICATION OF REMOTE MONITORING SYSTEM FOR CHEMICALS DOSING IN WATER TREATMENT OF POWER PLANTS
APPLICATION OF LARGE FLOW RATE FULLFILM WATER TREATMENT TECHNOLOGY IN POWER PLANTS
CAUSE ANALYSIS OF SEVERE FOULING ON ULTRAFILTRATION MEMBRANE AND OFF-LINE CHEMICAL CLEANING THEREOF
EVALUATION METHOD FOR SCALING-RETARDATION BEHAVIOR OF WATER-QUALITY STABILIZING AGENT USED IN CIRCULATING WATER TREATMENT AT THERMAL POWER PLANT
RETROFITTING OF AUXILIARY VALVE FOR SOLENOID BLOWOUT VALVES

Related Author

XU Ting
YANG Wansheng
YAO YongShanghai Fengxian Gas Turbine Power Generation Co Ltd
CHANG Liang
WU Wenlong Henan Electric Power Testing and Research Institute
JIANG Qi
YAN Kun
XU Jianxue

Related Institution

Wuhan University
Shanghai Fengxian Gas Turbine Power Generation Co., Ltd
Henan Electric Power Test and Research Institute
Guodian Thermal Power Research Institute
0