您当前的位置:
首页 >
文章列表页 >
RETROFIT OF PLATEN REHEATER FOR 480t/h CFB BOILER
Thermal Power Generation   Vol. 39, Issue 10, Pages: 73-76(2010)
更新时间:2025-09-28
    • RETROFIT OF PLATEN REHEATER FOR 480t/h CFB BOILER

    • CLC: TK229.66
    • Published:2010

    移动端阅览

  • YANG Yongbo1, DUAN Kening1, JIANG Jianzhong2, et al. RETROFIT OF PLATEN REHEATER FOR 480t/h CFB BOILER[J]. Thermal Power Generation, 2010, 39(10): 73-76. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

84

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Reheater transformation for a 135 MW CFB boiler
STUDY ON OVER-TEMPERATURE OF PLATEN TYPE REHEATER FOR BOILERS WITH FOUR CORNER TANGENTIAL FIRING
NEW CALCULATION SOFTWARE AND ITS PRACTICAL APPLICATION FOR CALCULATING WALL TEMPERATURE OF HIGH TEMPERATURE CONVECTIVE HEATING SURFACE FOR A BOILER
TEST AND STUDY ON OVERTEMPERATURE TUBEBURST OF HEATING SURFACE FOR 670t/h BOILER IN ZHANGZE POWER PLANT
CAUSE ANALYSIS OF TUBE-BURST ON HIGH-TEMPERATURE SUPERHEATER OF BOILER EQUIPPED FOR 600 MW UNITS AND PREVENTIVE MEASURES THEREOF

Related Author

LI Qindao1
HU Zhihong2
HAO Weidong2
WANG Dongfeng1 1.College of Control and Computer
刘尧平
娄春
DENG Guangfa
蔡新春

Related Institution

School of Control and Computer Science, North China Electric Power University
Shandong Electric Power Group Electric Power Science Research Institute
Huazhong University of Science and Technology
Jiangsu Electric Power Research Institute
0