ANALYSIS OF RUPTURE FAULT OCCURRED ON PLUG-IN PIPE FOR HP STEAM INCOMING TO 300 MW STEAM TURBINE
Thermal Power Generation   Vol. 39, Issue 9, Pages: 110-112(2010)
更新时间:2025-09-28
    • ANALYSIS OF RUPTURE FAULT OCCURRED ON PLUG-IN PIPE FOR HP STEAM INCOMING TO 300 MW STEAM TURBINE

    • CLC: TK263.5
    • Published:2010

    移动端阅览

  • FAN Jianzhong1, LIU An21.Guangzhou Zhujiang Power Plant. ANALYSIS OF RUPTURE FAULT OCCURRED ON PLUG-IN PIPE FOR HP STEAM INCOMING TO 300 MW STEAM TURBINE[J]. Thermal Power Generation, 2010, 39(9): 110-112. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

85

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

FAILURE ANALYSIS AND PREVENTION OF "851"BLADE BREAKAGE
CAUSE ANALYSIS OF GOVERNING VALVE FAULT FOR STEAM TURBINES AND PREVENTIVE MEASURES THEREOF
CAUSE ANALYSIS OF CRIPPLING FAILURE FOR MP 10TH DIAPHRAGM AND BLADES OF 300MW STEAM TURBINE IN ONE POWER PLANT AND DISPOSAL THEREOF
Reason analysis for fracture occurred in axial induced draft fan blade of a 600 MW unit
Optimization calculation for sliding pressure of steam turbine with extraction for heating

Related Author

王荻
朱洪波
胡昌镁
巫光峰
SUN Lijun
NI GuijieZhengzhou Electric Power Senior Professional College
GU Weiwei
ZHANG Yonghai

Related Institution

Guangdong Electric Power Test and Research Institute
Guangdong Electric Power Group Co., Ltd.
Shajiao C Power Plant
Shajiao C Power Plant Guangdong Humen
0