您当前的位置:
首页 >
文章列表页 >
CAUSE ANALYSIS OF TUBE-BURST ON HIGH-TEMPERATURE SUPERHEATER OF HOME-MADE SUPERCRITICAL 670 MW UNITS
Thermal Power Generation   Vol. 39, Issue 9, Pages: 103-105(2010)
更新时间:2025-09-28
    • CAUSE ANALYSIS OF TUBE-BURST ON HIGH-TEMPERATURE SUPERHEATER OF HOME-MADE SUPERCRITICAL 670 MW UNITS

    • CLC: TK223.32;TK228
    • Published:2010

    移动端阅览

  • LIU Shuang1, ZHAO Yongning1, LIU Tianzuo2, et al. CAUSE ANALYSIS OF TUBE-BURST ON HIGH-TEMPERATURE SUPERHEATER OF HOME-MADE SUPERCRITICAL 670 MW UNITS[J]. Thermal Power Generation, 2010, 39(9): 103-105. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

97

下载量

12

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSE ANALYSIS OF TUBE-BURST ON HIGH-TEMPERATURE SUPERHEATER OF BOILER EQUIPPED FOR 600 MW UNITS AND PREVENTIVE MEASURES THEREOF
ANALYSIS OF TUBE-BURST FOR T91 AND T22 SUPERHEATER TUBES
NEW CALCULATION SOFTWARE AND ITS PRACTICAL APPLICATION FOR CALCULATING WALL TEMPERATURE OF HIGH TEMPERATURE CONVECTIVE HEATING SURFACE FOR A BOILER
ANALYSIS OF SUPER-HEATER PIPE RUPTURE IN BOILER DUE TO BLOCKAGE
Reason analysis on deformation and tube burst of high temperature reheater for a supercritical boiler

Related Author

ZHANG Jiwen
YUAN Yanming
LIAO Weihui Shanwei Power Plant
赵彦芬
张路
王正品
刘江南
DENG Guangfa

Related Institution

Shanwei Power Plant
Suzhou Thermal Power Research Institute
Xi'an Institute of Technology
Jiangsu Electric Power Research Institute
0