您当前的位置:
首页 >
文章列表页 >
ANALYSIS OF OVERTEMPERATURE PROBLEM OCCURRED ON PIPE WALL OF HIGH-TEPERATURE HEATING SURFACE FOR BOILERS IN ZHUHAI POWER PLANT AND SOLVING SCHEME THEREOF
Thermal Power Generation   Vol. 39, Issue 1, Pages: 49-51(2010)
更新时间:2025-09-28
    • ANALYSIS OF OVERTEMPERATURE PROBLEM OCCURRED ON PIPE WALL OF HIGH-TEPERATURE HEATING SURFACE FOR BOILERS IN ZHUHAI POWER PLANT AND SOLVING SCHEME THEREOF

    • CLC: TK223.32
    • Published:2010

    移动端阅览

  • YE Shan-pei1, WANG Chun-chuang21.Guangqian Electric Power Co Ltd. ANALYSIS OF OVERTEMPERATURE PROBLEM OCCURRED ON PIPE WALL OF HIGH-TEPERATURE HEATING SURFACE FOR BOILERS IN ZHUHAI POWER PLANT AND SOLVING SCHEME THEREOF[J]. Thermal Power Generation, 2010, 39(1): 49-51. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

144

下载量

6

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
CAUSE ANALYSIS OF SLAGGING IN BABCOCK 2209 t/h BOILERS MADE IN GERMANY AND PREVENTION THEREOF
STUDY ON CORRELATION BETWEEN AIR FLOW RATE AT FURNACE INLET AND FLUE GAS TEMPERATURE AT FURNACE OUTLET
CAUSES LEADING TO ASH CLOGGING IN AIR PREHEATER AND DISPOSAL MEASURES THEREOF
A REVIEW ON THE LOCALIZATION COURSE OF MANUFACTURING POWER GENERATION EQUIPMENTS FOR HUANENG POWER PLANTS

Related Author

CHANG Shi-ji
LIANG Gui-long
LI Hu
WANG Chun-changXi'an Thermal Power Research Institute Co Ltd
ZHANG Lin
LI Yang-chun Huaneng Changxing Power Generation Co Ltd
PENG Dawei
CHEN Feng

Related Institution

Zhungeer Power Plant Hohhot
Huaneng Dezhou Power Plant
Huaneng Yuhuan Power Plant
Huaneng Changxing Power Generation Co., Ltd
Huaneng International Power Co., Ltd
0