您当前的位置:
首页 >
文章列表页 >
OPTIMIZATION OF CONTROL LOGIC FOR PREVENTING EXPLOISION IN TOWER TYPE FURNACE OF BOILER EQUIPED FOR 1000 MW UNIT
Thermal Power Generation   Vol. 39, Issue 2, Pages: 82-84(2010)
更新时间:2025-09-28
    • OPTIMIZATION OF CONTROL LOGIC FOR PREVENTING EXPLOISION IN TOWER TYPE FURNACE OF BOILER EQUIPED FOR 1000 MW UNIT

    • CLC: TM621.2
    • Published:2010

    移动端阅览

  • ZHU Jiang-tao, ZHU Jie-nan, GAO Jin-yao, et al. OPTIMIZATION OF CONTROL LOGIC FOR PREVENTING EXPLOISION IN TOWER TYPE FURNACE OF BOILER EQUIPED FOR 1000 MW UNIT[J]. Thermal Power Generation, 2010, 39(2): 82-84. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

114

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

COMPARISON OF STRUCTURAL DESIGN FOR THREE 1000 MW STEAM TURBINES
INSTALLATION OPTIMIZATION OF STEAM-DRIVEN FEED-WATER BOOSTER PUMP FOR ULTRA-SUPERCRITICAL 1000 MW UNIT
STUDY ON RETROFITING INDUCED DRAFT FAN AND FGD BOOSTER FAN TOGETHER FOR 1000 MW UNIT
STUDY ON THE CONTROL MODEL OF INTERMEDIARY POINT TEMPERATURE IN BOILER OF ULTRA-SUPERCRITICAL UNIT BASED ON DYNAMIC MECHANISM ANALYSIS
COMPARISON OF STEAM DISTRIBUTION MODES FOR ULTRA-SUPERCRITICAL 1 000 MW UNITS

Related Author

ZHU Bao-tianXi'an Thermal Power Research Institute Co Ltd
CHEN Jian-xian
TAO Lei Guodian Beilun Power Plant
LIU Jiayu1
WANG Baohua2
YUE Jiaquan1
L Chunjun21.Xi'an Thermal Power Research Institute Co Ltd
FANG Yanjun1

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Guodian Beilun Power Plant
Guodian Taizhou Power Generation Co., Ltd
Department of Automation, Wuhan University
Guangdong Power Grid Corporation Electric Power Science Research Institute
0