SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS
Thermal Power Generation   Vol. 38, Issue 12, Pages: 1-4(2009)
更新时间:2025-09-28
    • SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS

    • CLC: TM611.3
    • Published:2009

    移动端阅览

  • YE Shan-pei1, YAO Xiao-lin2, SHI Yan-zhou21.Shenzhen Guangqian Electric Power Co Ltd. SEVERAL PROBLEMS NEEDING TO PAY ATTENTIONS IN CONTRACT TERMS FOR PROCURING MAIN EQUIPMENTS OF COMBINED CYCLE POWER GENERATION UNITS[J]. Thermal Power Generation, 2009, 38(12): 1-4. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

75

下载量

0

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

APPLICATION OF Simatic PCS7 DISTRIBUTED CONTROL SYSTEM ON GAS & STEAM TURBINE COMBINED CYCLE GENERATING UNIT
Modeling method for characterizing condenser system based on multi-fidelity data and transfer learning
Integration and performance analysis of high back pressure gas turbine combined cycle power generation system
Influence of steam extraction for heating on HRSG steam parameter
Optimization of Fresnel solar and gas-steam combined cycle hybrid power generation system

Related Author

曾卫东
张伟
薛建中
何新
景效国
张逸佳
任少君
朱保宇

Related Institution

Guodian Thermal Power Research Institute
MHPS Dongfang Boiler Co,.LTD
Huaneng Clean Energy Research Institute
Datang Suzhou Thermal Power Co.,Ltd.,Wujiang
0