SAFETY AND ECONOMIC ANALYSIS OF UNITS USED FOR DEEP PEAK-REGULATING OPERATION IN HEZE POWER PLANT AND RETROFIT MEASURES THEREOF
Thermal Power Generation   Vol. 38, Issue 10, Pages: 48-49(2009)
更新时间:2025-09-28
    • SAFETY AND ECONOMIC ANALYSIS OF UNITS USED FOR DEEP PEAK-REGULATING OPERATION IN HEZE POWER PLANT AND RETROFIT MEASURES THEREOF

    • CLC: TM621
    • Published:2009

    移动端阅览

  • GAO Jun-ru1, HOU Zhao-yi2, LIU Qi-liang2 1.Department of Power Engineering. SAFETY AND ECONOMIC ANALYSIS OF UNITS USED FOR DEEP PEAK-REGULATING OPERATION IN HEZE POWER PLANT AND RETROFIT MEASURES THEREOF[J]. Thermal Power Generation, 2009, 38(10): 48-49. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

321

下载量

9

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

OPTIMIZATION OF DEB COORDINATED CONTROL SYSTEM FOR 300 MW UNIT
CAUSE ANALYSIS AND CONTROL MEASURES OF UNSTABLE VIBRATION IN SHAFTING SYSTEM OF 300 MW TURBO-GENERATOR
CAUSE ANALYSIS OF HIGH-PRESSURE HEATER LEAKAGE FOR 300MW UNIT AND COUNTERMEASURES THEREOF
ANALYSIS OF UNUSUAL TEMPERATURE VARIATION CONCERNING MEDIUM-PRESSURE CYLINDER IN START-UP PROCESS OF 330 MW UNIT MADE BY ROMANIA
CAUSE ANALYSIS OF WATER CONTENT EXCEEDING STANDARD LIMIT IN TURBINE OIL AND TREATMENT THEREOF

Related Author

HE Tong-xiang
ZHANG Hua-lei
LI Ya-jun
LI Su-qing
YANG Shi-bin
LIU Wei-dong(Guodian Taiyuan Thermal Power Plant No.1
CAO Zhi-yang(Huaneng Pinliang Power Generation Co Ltd
MA Wang-peng

Related Institution

Huadian Xinjiang Branch
North China Electric Power University
Guodian Taiyuan First Thermal Power Plant
Huaneng Pingliang Power Generation Co., Ltd
0