您当前的位置:
首页 >
文章列表页 >
MAINTENANCE STRATEGY OF LARGE-CAPACITY GAS-STEAM COMBINED CYCLE UNIT
Thermal Power Generation   Vol. 38, Issue 9, Pages: 89-91(2009)
更新时间:2025-09-28
    • MAINTENANCE STRATEGY OF LARGE-CAPACITY GAS-STEAM COMBINED CYCLE UNIT

    • CLC: TK268
    • Published:2009

    移动端阅览

  • LI Fang-ji, DENG Xu-dong Shenzhen Guangqian Electric Power Co Ltd. MAINTENANCE STRATEGY OF LARGE-CAPACITY GAS-STEAM COMBINED CYCLE UNIT[J]. Thermal Power Generation, 2009, 38(9): 89-91. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

147

下载量

7

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

Practical application and technical discussions of the first set of 1 000 MW domestic full-capacity feed pump unit
Reliability state identification for key auxiliary equipments in thermal power units
Difficulties and countermeasures of quality control in wind turbine blades
Reliability assessment of distributed energy system
APPLICATION OF RELIABILITY-CENTERED MAINTENANCE TECHNOLOGY ON STEAM TURBINE AND IT'S AUXILIARY EQUIPMENT SYSTEM

Related Author

王珊珊
王海英
唐永利
姜宏伟
江飞
胡永海
安宗武
尚卫军

Related Institution

Guohua Electric Power Branch, China Shenhua Energy Co., Ltd.
Xi’an Thermal Power Research Institute Co., Ltd.
College of Energy and Mechanical Engineering, Shanghai University of Electric Power
内蒙呼和浩特
0