您当前的位置:
首页 >
文章列表页 >
STUDY ON EMULATION MODEL FOR PRESSURE AND WATER-LEAVEL IN THE DRUM OF 360 MW UNIT
Thermal Power Generation   Vol. 38, Issue 10, Pages: 20-24(2009)
更新时间:2025-09-28
    • STUDY ON EMULATION MODEL FOR PRESSURE AND WATER-LEAVEL IN THE DRUM OF 360 MW UNIT

    • CLC: TM621
    • Published:2009

    移动端阅览

  • XIANG Xian-bing, XIANG ShangPower Department. STUDY ON EMULATION MODEL FOR PRESSURE AND WATER-LEAVEL IN THE DRUM OF 360 MW UNIT[J]. Thermal Power Generation, 2009, 38(10): 20-24. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

93

下载量

2

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

EMULATION STUDY ON DMCPID CONTROL OF SUPERHEATED STEAM SYSTEM IN THERMAL POWER PLANT
IMPROVED ENERGY-BALANCE METHOD FOR MONITORING THE PULVERIZED COAL AND AIR FLOW
ENERGY-SAVING IN PLANT SERVICE POWER CONSUMPTION OF IMPORTED 360 MW UNITS AND BENEFIT ANALYSIS THEREOF
MATHEMATIC MODEL AND DYNAMIC CHARACTERISTICS OF ONCE-THROUGH BOILER FOR A 300 MW UNIT
REALIZING EMULATION OF DCS FAULT BY USING AN EMULATOR

Related Author

LIN Sicheng
LI Zhijun
LI Xueming
WANG Fuqiang
XUE Yuqing
ZHOU Naijun
XU Ke
LENG Wei(Southeast China University

Related Institution

湖北襄樊
Hubei Xiangfan Power Generation Co., Ltd.
North China Electric Power University
Central South University
0