您当前的位置:
首页 >
文章列表页 >
CONTROL OF STEAM-WATER QUALITY FOR THE DIRECT AIR COOLED UNIT HAVING BEEN NEWLY PUT INTO OPERATION
Thermal Power Generation   Vol. 38, Issue 8, Pages: 107-109(2009)
更新时间:2025-09-28
    • CONTROL OF STEAM-WATER QUALITY FOR THE DIRECT AIR COOLED UNIT HAVING BEEN NEWLY PUT INTO OPERATION

    • CLC: TM621.8
    • Published:2009

    移动端阅览

  • JIN Mao-lin1, YU Xue-bin2, TIAN Li3, et al. CONTROL OF STEAM-WATER QUALITY FOR THE DIRECT AIR COOLED UNIT HAVING BEEN NEWLY PUT INTO OPERATION[J]. Thermal Power Generation, 2009, 38(8): 107-109. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

66

下载量

1

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

HOT-STATE FLUSHING OF DIRECT AIR-COOLED UNIT
OPTIMIZATION ALLOCATION OF THE CONDENSATE PULISHING SYSTEM FOR DIRECT AIR-COOLING UNITS
COMPARISON OF CONDENSATE TREATMENT IN MIXED BED AND IN SYSTEM OF SINGLE-BEDS OPERATED IN SERIES
APPLICATION OF THE CATION-ANION SEPERATED BED CONDENSATE POLISHING SYSTEM ON DIRECT AIR COOLING UNIT
STUDY ON AND DESIGN OF RESIDUAL HEAL UTILIZATION SYSTEM FOR FLUE GAS IN THERMAL POWER PLANTS

Related Author

LI Zhi-cheng
WANG Ying-gao North China Electric Power Science Research Institute
TIAN Wen-hua
LI Peng
HE Hui-yongXi'an Thermal Power Research Institute Co Ltd
LI Zhi-gangXi'an Thermal Power Research Institute Co Ltd
HAN Li-chuan
WANG Ying-gaoNorth China Electric Power Science Research Institute

Related Institution

North China Electric Power Research Institute
Beijing Guodian Huabei Electric Power Engineering Co., Ltd
Hebei Electric Power Research Institute
Huaneng Tongchuan Power Plant
Datang Baqiao Thermal Power Plant
0