COMMISSIONING AND OPERATION OF 1000 MW ULTRA-SUPERCRITICAL ONCE-THROUGH BOILERS
Thermal Power Generation   Vol. 38, Issue 5, Pages: 38-41(2009)
更新时间:2025-09-28
    • COMMISSIONING AND OPERATION OF 1000 MW ULTRA-SUPERCRITICAL ONCE-THROUGH BOILERS

    • CLC: TK229.2
    • Published:2009

    移动端阅览

  • HU Zhi-hong1, LIU Fu-guo2, WANG Jun2, et al. COMMISSIONING AND OPERATION OF 1000 MW ULTRA-SUPERCRITICAL ONCE-THROUGH BOILERS[J]. Thermal Power Generation, 2009, 38(5): 38-41. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

229

下载量

3

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

WATER-LEVEL CONTROL IN ULTRA-SUPERCRITICAL ONCE-THROUGH BOILER OF 1000 MW UNIT
Simulation on mechanism model of intermediate point temperature for an ultra-supercritical 1000MW unit once-through boiler
Analysis and optimization for online operation performance indexes of the ultra supercritical 1 000 MW double-reheat unit in Laiwu Power Plant
ANALYSIS AND DISPOSAL OF PROBLEM FOR CARRYING BIG GRAINS INTO COAL PULVERIZING SYSTEM OF 1000 MW ULTRA-SUPERCRITICAL UNIT
DETECTION OF MATERIAL DEFECTS IN P92 STEEL MAIN STEAM PIPELINE OF ULTRA-SUPERCRITICAL UNIT

Related Author

WU Yan-binHudian Zhouxian Power Plant
YE Xiangqian
WANG Zhenyu
LI Xin
FANG Yanjun
WU Tao
CHU Mo
MA Pengbo

Related Institution

Huadian Zouxian Power Plant
Guangdong Power Grid Corporation Electric Power Science Research Institute
School of Power and Mechanical Engineering, Wuhan University
Xi’an Thermal Power Research Institute Co., Ltd.
Huaneng Laiwu Power Generation Co., Ltd.
0