您当前的位置:
首页 >
文章列表页 >
INCREASING HERMETICITY OF AIR PREHEATER IN COAL-FIRED POWER PLANT
Thermal Power Generation   Vol. 38, Issue 6, Pages: 56-57(2009)
更新时间:2025-09-28
    • INCREASING HERMETICITY OF AIR PREHEATER IN COAL-FIRED POWER PLANT

    • CLC: TK223.34
    • Published:2009

    移动端阅览

  • LI Jian-hong Huaneng Yushe Power Plant. INCREASING HERMETICITY OF AIR PREHEATER IN COAL-FIRED POWER PLANT[J]. Thermal Power Generation, 2009, 38(6): 56-57. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

97

下载量

6

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

AIR PREHEATER SEAL RETROFITTING OF THE 800 MW BOILER
BENDING ROTOR'S VIBRATION CONTROL OF STEAM TURBINE FOR A 300MW UNIT
RETROFITTING AIR PREHEATER OF BOILER TO ADOPT CONTACTING TYPE FLEXIBLE SEAL
Diagnosis method for crack faults in rotating machinery rotors in operation and its field application
A rotor fault diagnosis method based on EEMD cloud model and SVM

Related Author

ZOU Hai-feng1
LI Ying21.School of Business Administration
袁立平
罗剑斌
李力
谭士森
XI Guang-hui
ZHANG JunDatang Xutang Power Generation Co Ltd

Related Institution

School of Business Administration, North China Electric Power University
Shenhua Guohua (Beijing) Electric Power Research Institute
Henan Electric Power Test and Research Institute
Henan Electric Power Test and Research Institute Zhengzhou
0