您当前的位置:
首页 >
文章列表页 >
COMMISION DEBUGGING OF AIR-COOLED ISLAND SYSTEMS FOR 600MW AIR-COOLED UNITS
Thermal Power Generation   Vol. 38, Issue 7, Pages: 66-68(2009)
更新时间:2025-09-28
    • COMMISION DEBUGGING OF AIR-COOLED ISLAND SYSTEMS FOR 600MW AIR-COOLED UNITS

    • CLC: TM621
    • Published:2009

    移动端阅览

  • Yang Hai-sheng1, LI Lu-jiang1, WU Rei-tao1, et al. COMMISION DEBUGGING OF AIR-COOLED ISLAND SYSTEMS FOR 600MW AIR-COOLED UNITS[J]. Thermal Power Generation, 2009, 38(7): 66-68. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

109

下载量

4

CSCD

Alert me when the article has been cited
提交
Outline
No Sections

Related Articles

IMPROVEMENT OF THE CONTROL SYSTEM IN AIR-COOLED ISLAND FOR 600MW UNIT IN HUANENG TONGCHUAN POWER PLANT
OPTIMIZATION OF THE CONTROL SYSTEM IN AIR-COOLED ISLAND OF 600 MW DIRECT AIR-COOLED UNITS
STUDY ON OPERATION OPTIMIZATION OF AIR-COLLED ISLAND FOR DIRECT AIR-COOLED UNITS

Related Author

GAO Kui
ZHAO Hui
LI Wen-jun
YU Gang
WU Heng-yunXi'an Thermal Power Research Institute Co Ltd
ZHAO Zhi-dan1
LIU Wen-ping2
SUN Jian-guo3

Related Institution

Xi'an Thermal Power Research Institute Co., Ltd
Siemens Power Plant Automation Co., Ltd
Dalat Power Plant
Huaneng Xinjiang Energy Development Co., Ltd
0